Changes between Version 6 and Version 7 of DeploymentPreparation


Ignore:
Timestamp:
Nov 30, 2016, 7:52:54 AM (8 years ago)
Author:
indrek
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DeploymentPreparation

    v6 v7  
    5252== Junction Box == 
    5353 
    54 Junction Box contains electrical and information technology devices that power and  
    55 save the measurement results from the Measurement device. Junction Box needs to be connected to ships 240V 
     54Junction Box contains electrical and information technology devices that provide power and  
     55save the measurement results from the Measurement device. Junction Box needs to be connected to ships 230V 
    5656power system and to the internet. The internet connection may be established via ships LAN 
    5757or via independent networks(satellites, mobile network). Details of network connection 
     
    6060The Junction Box needs to be indoors since it's 
    6161not weather proof nor climate controlled. 
    62 The cable connecting the Junction Box with the Measurement device should not be  
    63 longer than 40 m in order 
    64 to guarantee satisfactory data transfer reliability. The location for the junction box  
    65 should be picked accordingly. The junction box dimensions are L:50cm W:40cm D:20cm. 
     62The cable connecting the Junction Box with the Measurement device is 40 m in length by default. The location for the junction box  
     63should be picked accordingly. Cable length up to 300m can be provided upon request. The limit is 
     64set by power line communication 
     65distance. The junction box dimensions are L:50cm W:40cm D:20cm. 
    6666 
    6767== Additional information ==