Changes between Version 1 and Version 2 of DeploymentPreparation


Ignore:
Timestamp:
Oct 19, 2016, 10:15:44 AM (8 years ago)
Author:
indrek
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • DeploymentPreparation

    v1 v2  
    77== Introduction == 
    88 
    9 This guide is aimed to the the team responsible for deploying the Shipborn Lidar on a vessel  
     9This guide is aimed to the the team responsible for deploying the Shipborne Lidar on a vessel  
    1010or a rig. It will specify the conditions about system placement that need to be met for 
    11 optimal performance. Also, it will specify the information Ocean Visuals needs to prapare the 
    12 fastenings. 
     11optimal performance. Also, it will specify the information Ocean Visuals needs to prepare the 
     12fastenings for the measurement device. 
    1313 
    1414== Deployment on a ship ==  
     15 
     16[[Image(Ship_top.png, 200px, right, top)]] 
     17 
    1518 
    1619The laser beam should be aimed at the point where the ship movement would not create foam. 
     
    1922side, so the beam would hit water in front of the vessel. 
    2023 
    21 [[Image(Ship_top.png, 300px, right, top)]] 
    2224 
    2325The laser beam should not travel more than thirty meters before hitting the water. More than 
     
    3335[[Image(Ship_front.png, 300px)]] 
    3436 
     37Once the position has been decided please provide a drawing of the railing or 
     38other attachment point to Ocean Visuals.  
     39 
    3540== Deployment on a rig ==  
    3641 
     
    3843by ships or any other obsticle. The laser beam lenght limit is the same as with the deployment 
    3944on a vessel and the change in length due to waves should be taken into account. 
     45Once the position has been decided please provide a drawing of the railing or 
     46other attachment point to Ocean Visuals. 
    4047 
    4148[[Image(Rig.png, 300px)]]