Changes between Version 1 and Version 2 of DeploymentPreparation
- Timestamp:
- Oct 19, 2016, 10:15:44 AM (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
DeploymentPreparation
v1 v2 7 7 == Introduction == 8 8 9 This guide is aimed to the the team responsible for deploying the Shipborn Lidar on a vessel9 This guide is aimed to the the team responsible for deploying the Shipborne Lidar on a vessel 10 10 or a rig. It will specify the conditions about system placement that need to be met for 11 optimal performance. Also, it will specify the information Ocean Visuals needs to pr apare the12 fastenings .11 optimal performance. Also, it will specify the information Ocean Visuals needs to prepare the 12 fastenings for the measurement device. 13 13 14 14 == Deployment on a ship == 15 16 [[Image(Ship_top.png, 200px, right, top)]] 17 15 18 16 19 The laser beam should be aimed at the point where the ship movement would not create foam. … … 19 22 side, so the beam would hit water in front of the vessel. 20 23 21 [[Image(Ship_top.png, 300px, right, top)]]22 24 23 25 The laser beam should not travel more than thirty meters before hitting the water. More than … … 33 35 [[Image(Ship_front.png, 300px)]] 34 36 37 Once the position has been decided please provide a drawing of the railing or 38 other attachment point to Ocean Visuals. 39 35 40 == Deployment on a rig == 36 41 … … 38 43 by ships or any other obsticle. The laser beam lenght limit is the same as with the deployment 39 44 on a vessel and the change in length due to waves should be taken into account. 45 Once the position has been decided please provide a drawing of the railing or 46 other attachment point to Ocean Visuals. 40 47 41 48 [[Image(Rig.png, 300px)]]